The car park at the lower gate was full before eight. By the time the ribbon came down, a line of walkers reached back past the notice board, most of them people who had not set foot on the path since the night the river took the bridge.
The valley trail was never the hardest walk in the region, or the highest. It was the one people did first — with their parents, then with their own children — and its closure left a gap that no detour filled.
Rebuilding the gorge section
The stretch through the gorge could not be repaired where it stood. The river had moved, and the old line of the path now ran through open water for most of the spring. Surveyors walked the slope for a month before settling on a new route 130 feet uphill.
“We carried every stone for the new steps by hand. Nobody asked us to. It just needed doing.”Ines Carver, volunteer crew lead
Most of the work was done on weekends. Crews of ten or twelve met at the lower gate, split the tools between them, and walked in. A notebook kept in the crew hut recorded every section: who worked it, what was moved, what still needed doing.
What changes for walkers
The trail is a little longer and a little steeper than it was. The climb above the gorge adds 300 feet of ascent, and the view from the top of it is the one people now stop to photograph.
| Section | Condition | Distance |
|---|---|---|
| Lower gate to bridge | Open | 1.3 mi |
| Bridge to gorge steps | Open | 2.1 mi |
| Gorge high route | Open, steep | 1.6 mi |
| Upper meadow loop | Open | 2.1 mi |